
I've built a chart where I display a time series, with time on the X axis and a range of values on the Y axis.
Now, I've been asked to calculate how much time the variable spends in each possible value, and plot that as a horizontal histogram in the same chart.
So basically I'd have a horizontal plot and a vertical plot in the same chart. Is that at all possible?